News & Events

Filinvest to deliver uninterrupted power supply amid the threat of COVID-19

 

FDC Utilities, Inc. and its subsidiary, FDC Misamis Power Corporation which operates the 405 MW powerplant located in Misamis Oriental assure that necessary contingency plans are in place to ensure sustainability in our operations following the declaration of COVID-19 Code Red Sub-Level 2 in NCR.

We have adopted precautionary measures to minimize the impact on business continuity and at the same time safeguard the well-being of our employees.

In the event of a lockdown, we are confident that there will be no disruptions in our daily corporate and powerplant facility operations; and will remain committed in delivering reliable and cost-effective power to our stakeholders.